Well Plugging & Abandonment

XCLUDE IS A RIGLESS, SAFE & COST EFFECTIVE SOLUTION THAT PLUGS WELLS BY BLOCKING THE RESERVOIR FORMATION

Well abandonment is the biggest single decommissioning cost facing those operating in the North Sea. This is because we need to be sure that the well will never leak. At the moment this requires placing barriers in the well. If we could place a barrier in the reservoir that would isolate the formation and stop flow into the well. This would make abandonment much safer, easier and cheaper.

 

Watch the video above to see Xclude forming solid scale from its water-thin components.

 

 

Working with Heriot Watt University, OGIC and OGTC, Aubin has developed such a technology we call it Xclude. It’s low risk, safe to use and environmentally sensitive. Xclude can be applied with existing equipment and without a rig, offering significant cost savings to operators.

 

It’s time to take this out of the lab and prove it in the field, with OGTC support we want to speak to operators to identify candidate wells to take this technology forward.

 

For more information please contact: xclude@aubingroup.com

Xclude is a safe & cost effective reservoir barrier for Well P&A that can be applied without a rig or heavy pumping equipment